We carry out the following tests on projects:
⦁ Continuity test.
⦁ Insulation resistance test.
⦁ Earth resistance test.
⦁ Ducter test.
⦁ Dielectric test.
⦁ Polarity test.
⦁ Ratio test.
⦁ Current/voltage injection test on control systems.
⦁ Instrument and power transformer testing.
⦁ Torque wrench on busbar connections, cables, termination checks, etc.
⦁ Testing and energizing LV/HV cables.
⦁ Switchgear systems testing.
⦁ LV/HV electrical motors and transformers testing.
⦁ Lighting systems testing.
⦁ Supply and control circuit systems testing, etc.